As engineers, we assist CPAs, Tax Professionals and their clients.

Lindon Engineering Services

Lindon Engineering Services is an engineering cost analysis business with an emphasis on cost segregation analysis and asset disposition studies for all types of commercial businesses throughout the United States.

Business Solution Services

Cost Segregation is a method for a business to increase their short-term cash flow by deferring their tax liability in favor of accelerated depreciation on qualified assets.

Cost Segregation Analysis

Cost Segregation is a method for a business to increase their short-term cash flow by deferring their tax liability in favor of accelerated depreciation on qualified assets.

Asset Disposition

The release of the September 2013 IRS tangible property regulations (TD9636) under Sections 162(a) 263(a) has changed the manner in which the residual basis of existing assets is handled following removal on a remodeling project.

Construction Cost Control

One of the more difficult tasks we encounter with cost segregation studies is determining and reconciling the total cost of the facility whose cost we are trying to distribute.

Showing posts with label CostEngineering. Show all posts
Showing posts with label CostEngineering. Show all posts

What Do You Need to Know About the Practice of Professional Cost Engineering?

This blog takes a look at the various aspects that define an expert's roles and responsibilities in professional engineering costs. We see how the cost engineer will factor in the cost of human labor, materials, machinery, tools, and equipment needed to complete the project satisfactorily. The blog starts with talking about the basics of cost engineering. It covers the cost engineer's importance in any project involving a product or a service. It then talks about how this field contributes to enhancing the USP of total cost management principles. Then we cover three benefits of cost engineering. The first is that he ensures that there is minimum risk of scope creep. Next, he manages the budget of the project to avoid cost overruns. He also drives detailed and complete planning to ensure that there are no delays in completing the project.